Bristol warehouse solar economics 2026
Irradiance: 990-1,020 kWh/kWp/yr. Grid retail: 22-23p/kWh. SEG export: 9-12p/kWh. Avonmouth port logistics: 4.5-5.5yr. Cold chain: 4-5yr. Distribution: 5-6yr. WPD G99: 5-7 months BS postcodes.
Avonmouth and Severnside port and industrial solar
Avonmouth (BS11 — M5 J18/19): Avonmouth Docks handles aggregates, timber, chemicals, project cargo. Severnside Enterprise Zone (BS35 — M5 J17): major logistics development area. Key targets: Lineage Logistics Avonmouth cold store; Severnside new-build logistics (200-800 kW, 2010+ buildings). WPD G99 at BS11: 5-7 months. BS35 Severnside: 5-6 months — good available grid capacity on Severn Valley reinforced network.
M4/M5 Bristol logistics belt
Aztec West Business Park (BS32 — M4 J19 — 150-600 kW systems); Emersons Green (BS16 — last-mile and technology logistics); Portbury Dock (BS20 — automotive import logistics, BMW/VW/JLR vehicle imports, Scope 3 active); Almondsbury interchange (BS32 — M4/M5 junction logistics). Bristol irradiance advantage: every 1 MW Bristol system generates 30,000-50,000 kWh more annually than equivalent Midlands install — £6,600-£11,000 additional annual saving.
WPD G99 for Bristol BS postcodes
WPD serves all Bristol BS postcodes. G99: 5-7 months for 200 kW-3 MW. BS11 Avonmouth and BS35 Severnside: fastest at 5-6 months — Severn Valley reinforcement has increased available capacity. BS32 Almondsbury and Aztec West: 5-6 months. BS1-BS16 inner Bristol: standard 5-7 months. Submit G99 immediately after structural survey.
Common questions
Can I still get IETF funding for warehouse solar?
No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that no successor fund is planned, and solar PV was never an eligible technology.
How long does WPD G99 take at Avonmouth?
WPD serves Avonmouth BS11 and Severnside BS35. G99: 5-6 months — faster than the WPD average due to Severn Valley network reinforcement. Submit G99 immediately after structural survey.