Manufacturing self-consumption — sector-by-sector breakdown
Self-consumption rate by manufacturing type: (1) Food and drink processing (continuous, 24/7 operations — blast freeze, pasteurisation, mixing, milling): 88-94%. (2) Pharmaceutical manufacturing (sterile fill-and-finish, solid-dose — clean room HVAC continuous): 90-96%. (3) Automotive manufacturing (two-shift or three-shift — presses, robots, assembly): 85-91%. (4) Aerospace manufacturing (single-shift, high-precision CNC, autoclaves): 82-87%. (5) Ceramics and glass (kiln-based, solar offsets ancillary loads): 78-84%. (6) Metal forming and casting (foundry, heat treatment): 84-90%. High self-consumption means every kWh of PV generation has full value as grid import displacement (25-32p/kWh) rather than export (roughly 4–12p/kWh as at July 2026). This single factor is the most important driver of manufacturing solar economics.
Automotive Scope 3 supply chain mandates in detail
JLR (Jaguar Land Rover) Reimagine strategy: Scope 3 supplier requirement. JLR Tier-1 and Tier-2 suppliers undergo annual sustainability assessments. Renewable energy adoption (verified on-site generation): scored criterion with 2027 expectation for all major suppliers. Nissan Sunderland (Envision AESC Gigafactory adjacent): net zero plant ambition 2030. Tier-1 suppliers at Washington DC and Sunderland: Scope 3 assessment active from 2026. BMW Group (MINI Oxford, BMW UK): Scope 3 SBT-aligned programme. Oxfordshire and West Midlands suppliers face active BMW supplier assessment. Toyota UK (Burnaston, Derbyshire): Toyota supplier sustainability programme. Airbus Broughton (net zero 2030): Welsh and North West aerospace Tier-1/Tier-2 suppliers. Ask the installer for all major automotive programme-compatible verification certificates.
Manufacturing solar payback: sector-by-sector summary
After-tax payback (100% AIA, 25% corporation tax): Food processing: 2.5-3.5 years. Pharmaceutical manufacturing: 3-4 years. Automotive manufacturing: 3.5-5 years. Aerospace manufacturing: 3.5-5 years. Ceramics and glass: 3.5-4.5 years. Metal forming: 3-4 years. Paper/board: 2.5-3.5 years. Manufacturing inside a Freeport tax site: the 100% ECA can replace the AIA and 50% FYA on the same spend, which improves year-one relief only on spend above £1m.
Common questions
Can I still get IETF funding for warehouse solar?
No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that no successor fund is planned, and solar PV was never an eligible technology.
How do I demonstrate solar to an automotive supply chain assessor?
A well-built standard audit pack satisfies all major automotive supply chain assessments: PVSyst yield model, MCS commercial certificate, monthly generation export (CSV + PDF), embodied carbon LCA, customer-specific verification certificate. JLR, Nissan, BMW, Toyota, and Airbus supply chain assessors accept this documentation format.