South Tees Development Corporation — the scale of opportunity
The South Tees Development Corporation (STDC) controls 4,500 hectares (the former SSI Redcar steelworks) — one of the largest development opportunities in UK history. STDC has earmarked the site for: offshore wind manufacturing (GE Vernova offshore nacelles, Sea Green/Dogger Bank supply chain); hydrogen energy (Hydrogen Teesside — CCUS-linked blue hydrogen, green hydrogen via electrolysis); advanced metals manufacturing; petrochemical transition. Each of these sectors: (2) Within Teesside Freeport designated tax site; (3) Large industrial buildings with excellent rooftop PV potential; (4) Northern Powergrid DNO with historically good grid capacity for heavy industry.
Teesside Freeport ECA — qualifying sites
Teesside Freeport designated tax sites: South Tees Development Corporation (Redcar — 4,500 ha); Teesport (PD Ports — Middlesbrough dock estate); Billingham (INEOS Chemicals, ex-ICI, chemical park); and Wilton International industrial estate (SABIC UK, Huntsman, Sembcorp). Within these zones: 100% Enhanced Capital Allowances on plant and machinery. For a £3m manufacturing solar project at South Tees: the Freeport ECA, claimed instead of the AIA and 50% first-year allowance on the same spend, not on top of them, gives a £750,000 year-one tax saving at 25% corporation tax (versus £500,000 with AIA on £1m + 50% FYA on £2m). Check teessidefreeport.co.uk for site boundaries.
Common questions
Can I still get IETF funding for warehouse solar?
No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that no successor fund is planned, and solar PV was never an eligible technology.
What is Northern Powergrid G99 for Teesside sites?
Northern Powergrid covers Teesside and the North East. South Tees Development Corporation: 6-9 months G99 (heavy industrial grid, generally good capacity). Teesport: 4-7 months. Billingham: 5-8 months. Wilton: 5-8 months.