Skip to main content

Guide · finance

Teesside Freeport Solar: Clean Energy Hub, South Tees & Offshore Wind Supply Chain

Teesside Freeport (the UK's largest by land area at 4,500 hectares) is undergoing the most significant industrial transformation in the UK. The former SSI Redcar steelworks (South Tees Development Corporation) is being redeveloped as a net zero industrial campus — offshore wind manufacturing, hydrogen energy, advanced manufacturing, and clean energy logistics. The Industrial Energy Transformation Fund is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that no successor fund is planned, and solar PV was never an eligible technology.

  • Independent guide
  • Sourced 2026 data
  • No installer agenda
  • UK-wide

Check any installer you are considering on these registers — this site is an independent guide, not an installer

South Tees Development Corporation — the scale of opportunity

The South Tees Development Corporation (STDC) controls 4,500 hectares (the former SSI Redcar steelworks) — one of the largest development opportunities in UK history. STDC has earmarked the site for: offshore wind manufacturing (GE Vernova offshore nacelles, Sea Green/Dogger Bank supply chain); hydrogen energy (Hydrogen Teesside — CCUS-linked blue hydrogen, green hydrogen via electrolysis); advanced metals manufacturing; petrochemical transition. Each of these sectors: (2) Within Teesside Freeport designated tax site; (3) Large industrial buildings with excellent rooftop PV potential; (4) Northern Powergrid DNO with historically good grid capacity for heavy industry.

Teesside Freeport ECA — qualifying sites

Teesside Freeport designated tax sites: South Tees Development Corporation (Redcar — 4,500 ha); Teesport (PD Ports — Middlesbrough dock estate); Billingham (INEOS Chemicals, ex-ICI, chemical park); and Wilton International industrial estate (SABIC UK, Huntsman, Sembcorp). Within these zones: 100% Enhanced Capital Allowances on plant and machinery. For a £3m manufacturing solar project at South Tees: the Freeport ECA, claimed instead of the AIA and 50% first-year allowance on the same spend, not on top of them, gives a £750,000 year-one tax saving at 25% corporation tax (versus £500,000 with AIA on £1m + 50% FYA on £2m). Check teessidefreeport.co.uk for site boundaries.

Common questions

Can I still get IETF funding for warehouse solar?

No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that no successor fund is planned, and solar PV was never an eligible technology.

What is Northern Powergrid G99 for Teesside sites?

Northern Powergrid covers Teesside and the North East. South Tees Development Corporation: 6-9 months G99 (heavy industrial grid, generally good capacity). Teesport: 4-7 months. Billingham: 5-8 months. Wilton: 5-8 months.

Email us Enquire