Ipswich port warehouses solar: Port of Ipswich (ABP Ipswich — grain, bulk, container, refrigerated cargo) within Freeport East designated tax sites. Freeport East ECA: 100% ECA on qualifying plant and machinery. UKPN G99 (4-5 months for port sites). East Anglian irradiance 1,020-1,060 kWh/kWp/yr. Cold chain food import handling: 87-93% self-consumption. After-tax payback 3.5-4.5 years.
Local context — Ipswich
Ipswich port solar: Freeport East ECA (100% ECA as an alternative to standard 100% AIA on the same spend, not in addition to it (ECA carries no £1m cap) for eligible port sites), UKPN 4-5 months G99, east coast irradiance (1,020-1,060 kWh/kWp/yr). Cold chain port logistics: 87-93% self-consumption. After-tax payback 3.5-4 years. Port authority (ABP) pre-approval typically 4-6 weeks alongside UKPN G99.
Modelled scenario — Ipswich
Illustrative worked example — modelled from this site's indicative bands, not a real project.
A 1 MW solar PV install on an Ipswich port warehouse (within Freeport East designated zone). Freeport ECA: an alternative to the AIA and 50% FYA, never on top of them; it adds value only on spend above the £1m AIA limit. UKPN G99: 4.5 months. First-year generation 1,040,000 kWh. Self-consumption 88%. Annual saving £208,000. After-tax payback 3.9 years.
Common questions — port warehouses in Ipswich
Is Ipswich Port within the Freeport East designated zone?
Parts of Ipswich Port (ABP Ipswich Wet Dock and port operational area, IP3 postcode) are within the Freeport East designated tax site. Confirm exact building eligibility at freeportharbour.co.uk or through a desk feasibility — check building-level ECA eligibility.