Skip to main content

Liverpool City Region Freeport

Port Warehouse Solar in Liverpool

Specialist port warehouse solar delivered across Liverpool and North West. 2-4 MW typical typical. 4-year typical payback (Freeport ECA) payback. PPA, asset finance, or capital purchase.

  • MCS Certified
  • NICEIC
  • IWA-Backed
  • 500+ UK Sites

At a glance

500+

UK installs

5y

Typical payback

4.9★

Verified reviews

IWA

10-yr warranty

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001/14001/45001
  • Solar Energy UK
  • Logistics UK Member

Liverpool City Region Freeport encompasses the Port of Liverpool (Liverpool 2 deep-water terminal), the wider Mersey Docks estate, and the Sefton/Wirral logistics belt. Buildings within the designated zone qualify for 100% Enhanced Capital Allowances.

Local context — Liverpool

Liverpool port and freeport logistics operations include Peel Ports (port operator), major 3PL hubs serving the North West market, and the automotive/manufacturing supply chains using the port for import/export. Liverpool 2 deep-water terminal handles large container vessels — supporting major retailer import logistics estate that benefits from solar Scope 3 narrative.

Recent install — Liverpool

A 2.3 MW solar PV install on a Liverpool 2 area distribution warehouse within Liverpool City Region Freeport zone. Capex £1.7m. Year-1 tax shield £225k AIA + £425k Freeport ECA = £650k. First-year generation 2.10 GWh. Self-consumption 78%. Annual saving £346k + SEG £52k. Simple payback 4.3 years; 25-year IRR 28%.

UK Commercial Solar Network

Commercial solar across the UK

Part of the SEO Dons commercial solar network — specialist sites covering every UK B2B solar use case from factories and data centres to carports, EV charging, and PPA finance.

Call now Free quote