Wolverhampton manufacturing solar: galvanising (25-35%), i54 Business Park (JLR Engine Manufacturing Centre, Moog, GKN Aerospace — Scope 3 mandate). WPD G99: 5-7 months WV postcodes. Irradiance: 950-980 kWh/kWp/yr. Continuous foundry self-consumption: 90-95%. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.
Local context — Wolverhampton
Wolverhampton manufacturing solar: JLR Scope 3 mandate at i54. WPD 5-7 months G99. 90-95% self-consumption foundry and glass.
Modelled scenario — Wolverhampton
Illustrative worked example — modelled from this site's indicative bands, not a real project.
A 1.5 MW solar install at a Black Country hot-dip galvanising facility (WV14 — continuous bath process, 24/7 operation). AIA: £250k. Net effective capex: £914k. Annual saving (93% self-consumption, 26p/kWh): £360k.
Common questions — manufacturing in Wolverhampton
Can I still get IETF funding for warehouse solar?
No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.