Skip to main content

Midlands manufacturing belt

Manufacturing Solar in Warwickshire

Specialist manufacturing solar delivered across Warwickshire and West Midlands. 1-3 MW typical typical. 4.5-year typical payback payback. PPA, asset finance, or capital purchase.

  • MCS Certified
  • NICEIC
  • IWA-Backed
  • 500+ UK Sites

At a glance

500+

UK installs

5y

Typical payback

4.9★

Verified reviews

IWA

10-yr warranty

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001/14001/45001
  • Solar Energy UK
  • Logistics UK Member

Warwickshire hosts the wider Coventry-Warwick automotive Tier-1 cluster, plus engineering, electronics, and food production. Manufacturing operations are typically continuous-process or shift-pattern with strong daytime baseload — ideal solar economics.

Local context — Warwickshire

Warwickshire manufacturing solar economics align with Coventry Tier-1 cluster — 85-95% self-consumption typical, 100% AIA + 50% FYA tax shield maximally beneficial for typical 1-3 MW project values, customer Scope 3 mandates from JLR and Aston Martin Lagonda flow through to supplier programmes.

Recent install — Warwickshire

A 1.7 MW solar PV install on a Warwickshire engineering supply Tier-2 supplier serving JLR. First-year generation 1.58 GWh. Self-consumption 91%. Annual savings £325,000. Simple payback 4.6 years; 25-year IRR 25%.

UK Commercial Solar Network

Commercial solar across the UK

Part of the SEO Dons commercial solar network — specialist sites covering every UK B2B solar use case from factories and data centres to carports, EV charging, and PPA finance.

Call now Free quote