Manufacturing Solar in Tyneside

Specialist manufacturing solar delivered across Tyneside and North East. 150 kW – 4 MW typical. PPA, asset finance, or capital purchase.

  • Independent guide
  • Sourced 2026 data
  • No installer agenda
  • UK-wide

At a glance

UK-wide

Coverage

5y

Typical payback

By email

How we reply

10-yr

Workmanship warranty to require

Check any installer you are considering on these registers — this site is an independent guide, not an installer

Tyneside manufacturing solar: Team Valley Business Park (NE11 — 700+ businesses), Cobalt Business Park North Tyneside (Procter & Gamble, NE27), Newburn Riverside (NE15), offshore wind fabrication (Smulders, Cammell Laird Tyneside). FMCG processing (P&G Tyne), and precision engineering. Northern Powergrid G99: 5-8 months NE postcodes. Self-consumption continuous manufacturing: 84-91%.

Local context — Tyneside

Tyneside manufacturing solar: Procter & Team Valley mixed manufacturing 84-91% self-consumption. Northern Powergrid 5-8 months G99.

Modelled scenario — Tyneside

Illustrative worked example — modelled from this site's indicative bands, not a real project.

A 1.5 MW solar PV install at a Team Valley (NE11) precision engineering manufacturer. Northern Powergrid G99: 6 months. Self-consumption 87%. Annual saving: £272,500.

Common questions — manufacturing in Tyneside

Can I still get IETF funding for warehouse solar?

No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.