Ceramics · food processing · WPD 5-7 months G99 · M6 J15/16

Manufacturing Solar in Stoke-on-Trent

Specialist manufacturing solar delivered across Stoke-on-Trent and West Midlands. 300 kW – 5 MW typical. PPA, asset finance, or capital purchase.

  • Independent guide
  • Sourced 2026 data
  • No installer agenda
  • UK-wide

At a glance

UK-wide

Coverage

5y

Typical payback

By email

How we reply

10-yr

Workmanship warranty to require

Check any installer you are considering on these registers — this site is an independent guide, not an installer

Stoke-on-Trent manufacturing solar: Michelin UK tyre plant, ceramics manufacturing cluster, food processing (McVitie's, Steelite). WPD G99: 5-7 months ST postcodes. Irradiance: 940-970 kWh/kWp/yr. Self-consumption continuous manufacturing: 85-92%. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.

Local context — Stoke-on-Trent

Stoke manufacturing solar: WPD 5-7 months G99. 85-92% self-consumption. One of the Midlands' richest manufacturing solar clusters.

Modelled scenario — Stoke-on-Trent

Illustrative worked example — modelled from this site's indicative bands, not a real project.

A 1.2 MW solar install at a Stoke ceramics manufacturing facility. AIA: £140k. Net effective capex: £436k. Annual saving (88% self-consumption, 25p/kWh): £264k.

Common questions — manufacturing in Stoke-on-Trent

Can I still get IETF funding for warehouse solar?

No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.