Rotherham manufacturing solar: Liberty Steel Aldwarke and Templeborough, Outokumpu Stainless, Sheffield Forgemasters-adjacent supply chain, galvanising and metal treatment cluster. South Yorkshire Investment Zone (SYIZ) ECA reliefs are an alternative to standard AIA on the same spend, not an addition to it. Northern Powergrid G99: 4-8 months S postcodes. Steel self-consumption: 88-93%. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.
Local context — Rotherham
Rotherham steel solar: an Investment Zone ECA applies only inside a designated tax site, as an alternative to the AIA. A large steel manufacturing solar cluster. Northern Powergrid 4-8 months G99. 88-93% self-consumption for continuous electric arc steelmaking.
Modelled scenario — Rotherham
Illustrative worked example — modelled from this site's indicative bands, not a real project.
A 2.5 MW solar install at an Aldwarke (S60) steel supply chain fabrication facility (bar and rebar processing, electric furnace adjacent). On a £2.5m project, an Investment Zone ECA (only where the building sits inside a designated tax site) would relieve the whole £2.5m in year one (£625,000 at 25%), claimed instead of the AIA and 50% FYA, which together give £1.75m (£437,500). Annual saving (90% self-consumption, 26p/kWh): £585k.
Common questions — manufacturing in Rotherham
Can I still get IETF funding for warehouse solar?
No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.