Northampton manufacturing solar: Daventry International Rail Freight Terminal adjacent manufacturing; food and pharmaceutical manufacturing at Brackmills and Swan Valley; Kettering and Corby food processing (McCain potato, Greencore meals, Weetabix Burton Latimer). Self-consumption 86-93% for 24/7 food/pharmaceutical process load. WPD G99 5-7 months. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.
Local context — Northampton
Northampton manufacturing solar: Self-consumption 86-93%. AIA on qualifying capex.
Modelled scenario — Northampton
Illustrative worked example — modelled from this site's indicative bands, not a real project.
A 1.2 MW solar PV install on a Northamptonshire food manufacturing facility. First-year generation 1.15 GWh. Self-consumption 90%. Annual saving £230,000.
Common questions — manufacturing in Northampton
Can I still get IETF funding for warehouse solar?
No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.