Middlesbrough manufacturing solar: Wilton International; South Tees Development Corporation; Billingham. Northern Powergrid G99: 4-8 months TS postcodes. Continuous chemical process self-consumption: 91-96%. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.
Local context — Middlesbrough
Middlesbrough manufacturing solar: Teesside Freeport ECA + Northern Powergrid 4-8 months G99. 91-96% self-consumption chemical process.
Modelled scenario — Middlesbrough
Illustrative worked example — modelled from this site's indicative bands, not a real project.
A 4 MW solar install at Wilton International (TS10) chemical process facility within Teesside Freeport zone. Inside the tax site, the 100% Freeport ECA on the full £3m project, claimed instead of the AIA and 50% FYA, is a £3m deduction (£750,000 at 25%) versus £2m (£500,000) without it. Annual saving (94% self-consumption, 26p/kWh): £930k.
Common questions — manufacturing in Middlesbrough
Can I still get IETF funding for warehouse solar?
No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.