Grimsby manufacturing solar: Young's Seafood, Birds Eye, Findus, DAAL (IQF and blast freeze at -18°C to -40°C). Humber Freeport ECA within Grimsby Fish Docks designated zone. IQF, tunnel freeze, fish meal. Northern Powergrid 4-6 months G99. Self-consumption: 94-98% (24/7 compressor load). The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.
Local context — Grimsby
Grimsby manufacturing solar: several factors favour short paybacks for seafood processing and blast freeze operators.
Modelled scenario — Grimsby
Illustrative worked example — modelled from this site's indicative bands, not a real project.
A 3 MW solar PV install at a Grimsby blast freeze fish processing facility (Freeport East zone). Freeport ECA: an alternative to the AIA and 50% FYA, never on top of them; it adds value only on spend above the £1m AIA limit. G99: 5 months. Self-consumption 97%. Annual saving: £630,000.
Common questions — manufacturing in Grimsby
Does Young's Seafood at Grimsby qualify for Humber Freeport ECA?
Buildings within the Humber Freeport designated zone — which includes the Grimsby Fish Docks operational area — qualify for 100% ECA. Young's Seafood main processing facility (Riverside Estate, Grimsby) is adjacent to the Fish Docks. Confirm exact building-level eligibility at the desk-feasibility stage. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.