Skip to main content

Rolls-Royce, Toyota, Bombardier · East Midlands aerospace and automotive · Midlands irradiance

Manufacturing Solar in Derby

Specialist manufacturing solar delivered across Derby and East Midlands. 300 kW – 2.5 MW typical. PPA, asset finance, or capital purchase.

  • Independent guide
  • Sourced 2026 data
  • No installer agenda
  • UK-wide

At a glance

UK-wide

Coverage

5y

Typical payback

By email

How we reply

10-yr

Workmanship warranty to require

Check any installer you are considering on these registers — this site is an independent guide, not an installer

Derby is the UK's most significant aerospace and precision manufacturing city: Rolls-Royce Defence (the world's largest military aero engine manufacturer — Sinfin Lane campus, 6,000+ Rolls-Royce employees), Toyota Manufacturing UK (Burnaston, near Derby — 150,000+ Yaris Cross vehicles/year, net zero plant ambitions), Bombardier Transportation UK (Pride Park — UK's only train manufacturing facility). Combined with a strong food and drink manufacturing cluster (Rolls-Royce employee supply, Aldi Midlands distribution centre, Morrisons Midlands — adjacent). Western Power Distribution G99: 5-8 months for Derby commercial sites.

Local context — Derby

Irradiance: 945-975 kWh/kWp/yr. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.

Modelled scenario — Derby

Illustrative worked example — modelled from this site's indicative bands, not a real project.

A 1.8 MW solar PV install on a Rolls-Royce Tier-1 aerospace component manufacturer at Pride Park, Derby. First-year generation 1.70 GWh. Self-consumption 88% (continuous precision machining and assembly baseload). Annual saving £340,000. Simple payback 4.6 years; 25-year IRR 24%.

Common questions — manufacturing in Derby

Does Rolls-Royce require its Derby supply chain to adopt renewable energy?

Rolls-Royce net zero 2030 (own operations) and Sustainable Business ambitions include Scope 3 supply chain programme. Derby Tier-1 and Tier-2 manufacturers in the Rolls-Royce civil and defence supply chains face supplier sustainability assessments from 2026. Ask the installer for Rolls-Royce-compatible verification certificates.

Can I still get IETF funding for warehouse solar?

No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.

Email us Enquire