Skip to main content

Teesside food import cold chain · Freeport ECA · Northern Powergrid

Cold Storage Solar in Teesside

Specialist cold storage solar delivered across Teesside and North East. 300 kW – 2 MW typical. PPA, asset finance, or capital purchase.

  • Independent guide
  • Sourced 2026 data
  • No installer agenda
  • UK-wide

At a glance

UK-wide

Coverage

5y

Typical payback

By email

How we reply

10-yr

Workmanship warranty to require

Check any installer you are considering on these registers — this site is an independent guide, not an installer

Teesside cold storage solar: port cold chain at Teesport (refrigerated cargo handling, reefer container management — Freeport ECA applicable); food import cold chain at Tees Valley (ambient to chilled import distribution); Sainsbury's Tees Valley RDC (chilled retail distribution). Teesside Freeport ECA within Teesport designated zone. 24/7 refrigeration: 88-94% self-consumption. Northern Powergrid G99: 6-8 months. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.

Local context — Teesside

Teesside cold storage solar: Freeport ECA (Teesport zone) + Northern Powergrid G99 improving (6-8 months). Self-consumption 88-94% from continuous refrigeration.

Modelled scenario — Teesside

Illustrative worked example — modelled from this site's indicative bands, not a real project.

A 600 kW solar PV install on a Teesport adjacent food import cold store (within Teesside Freeport designated zone). Freeport ECA: an alternative to the AIA and 50% FYA, never on top of them; it adds value only on spend above the £1m AIA limit. First-year generation 577,800 kWh. Self-consumption 91%. Annual saving £115,560.

Common questions — cold storage in Teesside

Can I still get IETF funding for warehouse solar?

No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.

Email us Enquire