Skip to main content

McCain blast freeze · Greencore · WPD 5-6 months G99 · A1/A14 logistics

Cold Storage Solar in Peterborough

Specialist cold storage solar delivered across Peterborough and East Midlands. 300 kW – 5 MW typical. PPA, asset finance, or capital purchase.

  • Independent guide
  • Sourced 2026 data
  • No installer agenda
  • UK-wide

At a glance

UK-wide

Coverage

5y

Typical payback

By email

How we reply

10-yr

Workmanship warranty to require

Check any installer you are considering on these registers — this site is an independent guide, not an installer

Peterborough cold storage solar: McCain Foods Whittlesey; Greencore frozen food Peterborough; Gateway industrial cold 3PL. WPD G99: 5-6 months PE postcodes. Irradiance: 970-1,010 kWh/kWp/yr. Self-consumption blast freeze: 95-98%. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.

Local context — Peterborough

Peterborough cold storage solar: WPD 5-6 months G99.

Modelled scenario — Peterborough

Illustrative worked example — modelled from this site's indicative bands, not a real project.

A 3 MW solar PV install at a Peterborough frozen food IQF processing facility. AIA: £250k. Net effective capex: £1.13m. Annual saving (96% self-consumption, 25p/kWh): £540k.

Common questions — cold storage in Peterborough

Can I still get IETF funding for warehouse solar?

No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.

Email us Enquire