Middlesbrough cold storage solar: Teesport logistics cold chain (TS6 — fish import, chilled grocery); Wilton International cold storage (TS10 — port-adjacent Freeport zone); South Tees Development Corporation cold chain logistics. Teesside Freeport ECA for qualifying sites. Northern Powergrid G99: 4-8 months TS postcodes. Self-consumption blast freeze: 93-97%. The Industrial Energy Transformation Fund (IETF) is closed: its last application window shut on 19 April 2024, no successor fund is planned, and solar PV was never an eligible technology.
Local context — Middlesbrough
Middlesbrough cold storage solar: Teesside Freeport ECA + Northern Powergrid 4-8 months G99. 93-97% self-consumption. Teesport fish and chilled import cold chain primary zone.
Modelled scenario — Middlesbrough
Illustrative worked example — modelled from this site's indicative bands, not a real project.
A 600 kW solar install at Teesport (TS6) fish cold store within Teesside Freeport zone. Capital allowances: the Freeport ECA is an alternative to the AIA, not an addition, and at this size the AIA already relieves the whole qualifying spend in year one. Annual saving (95% self-consumption, 27p/kWh): £155k.
Common questions — cold storage in Middlesbrough
Which Middlesbrough cold storage sites qualify for Teesside Freeport ECA?
Teesside Freeport designated zones: South Tees Development Corporation (TS10), Teesport (TS6), Wilton International (TS10). Teesport cold chain and Wilton International cold storage are the primary qualifying cold store zones. Not all TS postcodes qualify — confirm at teessideitp.co.uk/freeport. Check eligibility at the desk-feasibility stage.