Skip to main content

Omega Warrington · Amazon Prime FC · M6/M62 J8 · ENW 5-8 months G99

Logistics Warehouse Solar in Warrington

Specialist logistics warehouse solar delivered across Warrington and North West. 400 kW – 3 MW typical typical. 4.5-year typical payback payback. PPA, asset finance, or capital purchase.

  • MCS Certified
  • NICEIC
  • IWA-Backed
  • 500+ UK Sites

At a glance

500+

UK installs

5y

Typical payback

4.9★

Verified reviews

IWA

10-yr warranty

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001/14001/45001
  • Solar Energy UK
  • Logistics UK Member

Warrington logistics warehouse solar: Omega (WA5, M62 J8 — Amazon Prime FC 1.2m sqft, DHL e-commerce, Hermes/Evri, Kuehne+Nagel, XPO), Winwick Road (WA2 — traditional logistics), Lingley Green (WA5 — modern logistics, DHL and 3PL). ENW G99: 5-8 months WA postcodes. Amazon Climate Pledge: on-site verified generation required. SEGRO Green Lease: tenant consent 4-6 weeks. Self-consumption Amazon FC: 78-84%. Payback: 4.5-5.5 years.

Local context — Warrington

Warrington logistics solar: Omega North West premier logistics park — Amazon Prime FC requires on-site solar. ENW 5-8 months G99. SEGRO Green Lease 4-6 weeks tenant consent. 78-84% self-consumption Amazon FC. 4.5-5.5 year payback. Retailer Scope 3 mandates (Amazon Climate Pledge, DHL GoGreen Plus) across Omega occupier base.

Recent install — Warrington

A 2 MW solar install at Omega (WA5) Amazon Prime FC (1.2m sqft). ENW G99: 7 months. Self-consumption 82%. Annual saving: £352k. Amazon Climate Pledge audit pack delivered. SEGRO consent: 5 weeks. Simple payback: 5.0 years.

Common questions — logistics warehouses in Warrington

Can Amazon at Omega Warrington install solar as a tenant?

Yes — SEGRO/Logistics Capital Partners at Omega use standard BBP Green Lease addenda. Amazon Climate Pledge requires on-site verified generation at Prime FC locations — PPA alone is no longer sufficient. Tenant consent: 4-6 weeks. ENW G99 WA5: 5-7 months. We deliver Amazon-format generation monitoring and audit packs.

UK Commercial Solar Network

Commercial solar across the UK

Part of the SEO Dons commercial solar network — specialist sites covering every UK B2B solar use case from factories and data centres to carports, EV charging, and PPA finance.

Call now Free quote