Warrington logistics warehouse solar: Omega (WA5, M62 J8 — Amazon Prime FC 1.2m sqft, DHL e-commerce, Hermes/Evri, Kuehne+Nagel, XPO), Winwick Road (WA2 — traditional logistics), Lingley Green (WA5 — modern logistics, DHL and 3PL). ENW G99: 5-8 months WA postcodes. Amazon Climate Pledge: on-site verified generation required. SEGRO Green Lease: tenant consent 4-6 weeks. Self-consumption Amazon FC: 78-84%. Payback: 4.5-5.5 years.
Local context — Warrington
Warrington logistics solar: Omega North West premier logistics park — Amazon Prime FC requires on-site solar. ENW 5-8 months G99. SEGRO Green Lease 4-6 weeks tenant consent. 78-84% self-consumption Amazon FC. 4.5-5.5 year payback. Retailer Scope 3 mandates (Amazon Climate Pledge, DHL GoGreen Plus) across Omega occupier base.
Recent install — Warrington
A 2 MW solar install at Omega (WA5) Amazon Prime FC (1.2m sqft). ENW G99: 7 months. Self-consumption 82%. Annual saving: £352k. Amazon Climate Pledge audit pack delivered. SEGRO consent: 5 weeks. Simple payback: 5.0 years.
Common questions — logistics warehouses in Warrington
Can Amazon at Omega Warrington install solar as a tenant?
Yes — SEGRO/Logistics Capital Partners at Omega use standard BBP Green Lease addenda. Amazon Climate Pledge requires on-site verified generation at Prime FC locations — PPA alone is no longer sufficient. Tenant consent: 4-6 weeks. ENW G99 WA5: 5-7 months. We deliver Amazon-format generation monitoring and audit packs.