Middlesbrough logistics warehouse solar: Teesport logistics and warehousing (TS6 — UK's 2nd largest port, container freight stations, 3PL, Freeport-eligible); Haverton Hill (TS23 — established industrial and logistics); Teesside Industrial Estate (TS17). Northern Powergrid G99: 4-8 months TS postcodes. Teesside Freeport ECA for qualifying Teesport buildings. Self-consumption logistics: 77-82%. Payback standard: 4-5 years; Freeport-eligible: 2.5-3.5 years.
Local context — Middlesbrough
Middlesbrough logistics solar: Teesport (TS6) — 2nd largest UK port, Freeport-eligible, Northern Powergrid 4-8 months. Freeport ECA qualifying sites: 2.5-3.5 year payback. Non-Freeport logistics: 4-5 years. TVCA net zero programme.
Recent install — Middlesbrough
A 800 kW solar install at Teesport (TS6) container freight station within Teesside Freeport zone. Freeport ECA + AIA: £200k tax shield. Northern Powergrid G99: 5 months. Self-consumption 80%. Annual saving: £192k at 30p/kWh Teesside tariff. After-ECA payback: 3.1 years.
Common questions — logistics warehouses in Middlesbrough
Which Middlesbrough logistics sites qualify for Teesside Freeport ECA?
Teesport (TS6) logistics and container freight operations are primarily within the Freeport designated zone. South Tees Development Corporation (TS10) logistics — also qualifying. Standard Teesside Industrial Estate (TS17) and Haverton Hill (TS23): generally outside the designated zone. Confirm building-level eligibility at teessideitp.co.uk/freeport.