Middlesbrough logistics warehouse solar: Teesport logistics and warehousing (TS6 — UK's 2nd largest port, container freight stations, 3PL, Freeport-eligible); Haverton Hill (TS23 — established industrial and logistics); Teesside Industrial Estate (TS17). Northern Powergrid G99: 4-8 months TS postcodes. Teesside Freeport ECA for qualifying Teesport buildings. Self-consumption logistics: 77-82%. Payback: 4-5 years before tax relief.
Local context — Middlesbrough
Middlesbrough logistics solar: Teesport (TS6) — 2nd largest UK port, Freeport-eligible, Northern Powergrid 4-8 months. Payback: 4-5 years before tax relief, wherever the site. TVCA net zero programme.
Modelled scenario — Middlesbrough
Illustrative worked example — modelled from this site's indicative bands, not a real project.
A 800 kW solar install at Teesport (TS6) container freight station within Teesside Freeport zone. Capital allowances: the Freeport ECA is an alternative to the AIA, not an addition, and at this size the AIA already relieves the whole qualifying spend in year one. Northern Powergrid G99: 5 months. Self-consumption 80%. Annual saving: £192k at 30p/kWh Teesside tariff.
Common questions — logistics warehouses in Middlesbrough
Which Middlesbrough logistics sites qualify for Teesside Freeport ECA?
Teesport (TS6) logistics and container freight operations are primarily within the Freeport designated zone. South Tees Development Corporation (TS10) logistics — also qualifying. Standard Teesside Industrial Estate (TS17) and Haverton Hill (TS23): generally outside the designated zone. Confirm building-level eligibility at teessideitp.co.uk/freeport.