Luton logistics warehouse solar: M1 J10/11 Luton Dunstable corridor (Houghton Regis, LU5 — modern logistics, 200-800 kW); Bramingham Park (LU3 — mixed logistics and commercial); Capability Green Business Park (LU1 — professional and light logistics). UKPN G99: 4-6 months. Irradiance: 980-1,010 kWh/kWp/yr. Self-consumption logistics: 78-82%. Payback: 4-5 years. Vauxhall Stellantis supply chain Scope 3 active in LU postcodes.
Local context — Luton
Luton logistics solar: UKPN 4-6 months G99. M1 J10/11 Houghton Regis modern logistics (LU5). 980-1,010 kWh/kWp/yr irradiance. 78-82% self-consumption. 4-5 year payback. Vauxhall Stellantis supply chain Scope 3 requirements.
Recent install — Luton
A 500 kW solar install at Houghton Regis (LU5) logistics park. UKPN G99: 4.5 months. Self-consumption 80%. Annual saving: £100k at 25p/kWh. Simple payback: 4.5 years. Stellantis supplier audit pack delivered.
Common questions — logistics warehouses in Luton
What is the best Luton logistics solar location?
Houghton Regis (LU5, M1 J11a): modern logistics park, UKPN good grid capacity, 980+ kWh/kWp/yr irradiance — best combination. Percival Way (LU2): airport cargo logistics — high self-consumption (83-88%) for cargo handling. Bramingham Park (LU3): mixed logistics, established UKPN connection precedent.