Leicester logistics: Magna Park Lutterworth (UK's largest dedicated logistics park, 900+ acres), DIRFT proximity, fashion DC cluster (NEXT PLC Enderby, River Island, ASOS regional, fashion 3PL on M1/M69 corridor). NEXT PLC Scope 3 scores DC operators on renewable energy. WPD G99: 5-7 months for Leicestershire logistics.
Local context — Leicester
Leicester logistics solar: NEXT Scope 3, Magna Park building stock (modern, clear-span — ideal PV), Golden Triangle irradiance (940-975 kWh/kWp/yr). Self-consumption fashion DC 78-83%. After-tax payback 3.5-4 years. Fashion and GM logistics at Magna Park: 750 kW – 3 MW per building.
Recent install — Leicester
A 2 MW solar PV install on a Magna Park Lutterworth fashion logistics facility. First-year generation 1.90 GWh. Self-consumption 80%. Annual saving £380,000. WPD G99: 6.5 months. Simple payback 4.6 years; 25-year IRR 24%.
Common questions — logistics warehouses in Leicester
Is Magna Park Lutterworth particularly good for solar?
Outstanding. Phase 2 and 3 buildings (2010+) are large-format clear-span profiled steel — ideal for ballasted PV. WPD has good grid capacity at Magna Park. NEXT PLC, Clipper, GXO, Waitrose, M&S at Magna Park all have active Scope 3 renewable energy requirements.