Swindon distribution centre solar: M4 J15-16 logistics belt (Delta Business Park, Groundwell Industrial Estate, Cheney Manor), Ocado Swindon NDC (one of UK's largest automated grocery fulfilment centres), Wincanton Swindon, Royal Mail Swindon SC. Honda Swindon (closed 2021) legacy supply chain — many tier-1 and tier-2 suppliers remain in SN postcodes. WPD G99: 5-7 months. Irradiance: 1,000-1,030 kWh/kWp/yr — good South West. Payback 5-6 years standard.
Local context — Swindon
Swindon DC solar: M4 J15-16 logistics belt, Ocado NDC, WPD 5-7 months G99. 1,000-1,030 kWh/kWp/yr South West irradiance. 78-83% self-consumption logistics. Honda supply chain Scope 3 pressure. 5-6 year payback.
Modelled scenario — Swindon
Illustrative worked example — modelled from this site's indicative bands, not a real project.
A 900 kW solar install at a Groundwell Industrial Estate (SN25) national grocery 3PL distribution centre. WPD G99: 6.5 months. Self-consumption 80%. Annual saving: £178k. AIA year-one tax shield: £112.5k. Simple payback: 4.7 years.
Common questions — distribution centres in Swindon
Can I still get IETF funding for warehouse solar?
No. The IETF is closed: its last application window shut on 19 April 2024, GOV.UK confirmed in July 2025 that it will not be extended and that no successor fund is planned, and solar PV was never an eligible technology.