Edinburgh's warehouse solar requires early G99 submission (SP Networks 8-12 months), and the business case should not count on a grant.
Edinburgh solar economics
Irradiance 840-870 kWh/kWp/yr. Grid retail 23-25p/kWh (Scottish network uplift). Standard DC payback: 6-8yr. Cold chain: 5-6.5yr.
Funding without a grant
The Business Energy Scotland SME Loan is not accepting solar PV applications. For an £800k system bought by a company, the whole cost falls within the £1m Annual Investment Allowance: £200k of year-one tax relief at 25%.
Livingston M8
Amazon FC (Climate Pledge active), DHL, B&Q DC. SP Networks G99 at EH54: 8-10 months.
SP Networks: submit early
8-12 months for 200 kW-3 MW. EH54 Livingston: 8-10 months. EH15-EH22 Midlothian: 9-12 months. Submit G99 same-week as structural survey.
See more
UK warehouse solar economics 2026 — at a glance
UK commercial solar PV for warehouses has fundamentally changed economically between 2019 and 2026. Three structural shifts drive current 4-6 year paybacks: grid electricity has nearly doubled from 12-15p/kWh blended day rate in 2019 to 16-26p/kWh in 2026, with peak Time-of-Use rates now reaching 28-35p/kWh during 16:00-19:00 evening peak; battery system cost has fallen from £700-£900/kWh installed in 2020 to £250-£450/kWh in 2026; and 100% Annual Investment Allowance up to £1m of capex per year delivers immediate 25% corporation tax relief on solar capex. A typical 1 MW warehouse rooftop solar install costs £700,000-£800,000, generates 870,000-950,000 kWh per year, displaces £155,000-£180,000 of grid electricity annually, and pays back in 4-5 years before tax — 3-4 years after AIA tax shield.
Compliance pressure driving warehouse solar adoption in 2026
Four UK compliance pressures shape warehouse solar decisions. (1) MEES: since 1 April 2023, let commercial property in England and Wales must have at least an EPC E rating unless an exemption is registered. The Government has proposed raising the minimum to a higher band; that is a proposal, not law, and has no confirmed date. Solar PV adds 5-15 EPC points and is often the most cost-effective compliance route for warehouse stock currently at EPC C-D. (2) ESOS Phase 4 (December 2027 deadline): Energy Savings Opportunity Scheme requires large UK businesses to commission energy audits and implement or document rationale for solar recommendations. (3) SECR reporting: mandatory Streamlined Energy and Carbon Reporting requires Scope 1+2 emissions disclosure in annual reports — solar PV directly reduces reported Scope 2 figure. (4) Customer Scope 3 mandates: Amazon Climate Pledge, Tesco Net Zero, M&S Plan A, Sainsbury's Plan for Better, John Lewis Net Zero, JLR/Stellantis Tier-1 supplier programmes all flow Scope 3 supplier requirements through contract weighting and CDP/EcoVadis reporting. 3PL operators and owner-occupied warehouses serving these customers may be asked to evidence renewable generation in tenders and supplier reviews.
What a warehouse solar feasibility should model
A sound feasibility starts from 12 months of half-hourly meter data and a roof drawing, because generic per-square-foot estimates miss the operating pattern that drives much of the payback. A thorough study includes a yield model for the roof orientation, tilt and shading; a self-consumption profile from half-hourly demand; a 25-year cash-flow model; the capital allowance position; any grant scheme still open to the site; export tariff income; an operations and maintenance cost schedule; and sensitivity checks on tariff inflation, self-consumption, cost per kW and discount rate. The outputs to ask for are simple payback, after-tax payback, IRR and NPV.
Ask about your own warehouse
Send your warehouse postcode and annual electricity spend through the quote form and we reply by email. This site is an independent guide, not an installer: it publishes sourced cost, grant and compliance information for UK warehouse roofs.