Commercial Solar Edinburgh 2026: SP Networks G99, Livingston Logistics & Scottish Enterprise Grants

Commercial solar Edinburgh 2026 — SP Energy Networks G99 8-12 months EH postcodes, Livingston M8 logistics park, Scottish Enterprise LCITP 20-35%, 840-870 kWh/kWp/yr Scottish irradiance. 4.5-7 year payback.

  • MCS Certified
  • NICEIC
  • IWA-Backed
  • 500+ UK Sites

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001/14001/45001
  • Solar Energy UK
  • Logistics UK Member

Edinburgh's warehouse solar requires early G99 submission (SP Networks 8-12 months) but Scottish Enterprise LCITP grants transform the economics.

Edinburgh solar economics

Irradiance 840-870 kWh/kWp/yr. Grid retail 23-25p/kWh (Scottish network uplift). Standard DC payback: 6-8yr. With LCITP 20-35%: 4.5-6yr. Cold chain: 5-6.5yr.

Scottish Enterprise LCITP

Low Carbon Infrastructure Transition Programme: 20-35% capital grants. SME: 30-35%. Large business: 20-25%. For £800k system at SME: LCITP 30% = £240k grant + AIA £200k = £440k year-one public funding. After-grant payback: 2.1 years.

Livingston M8

Amazon FC (Climate Pledge active), DHL, B&Q DC. SP Networks G99 at EH54: 8-10 months.

SP Networks: submit early

8-12 months for 200 kW-3 MW. EH54 Livingston: 8-10 months. EH15-EH22 Midlothian: 9-12 months. Submit G99 same-week as structural survey.

See more

Edinburgh guide: /guides/warehouse-solar-edinburgh/. Scotland grants: /guides/warehouse-solar-scotland/. Contact: /contact/.